This was a three phased demolition of the Barton Road Bridge over Interstate 15 which is the only access in and out of the City of Grand Terrace in San Bernardino County, CA. The project consisted of the removal of retaining walls, concrete barriers, portions of sound walls and bridge removal including the breaking and removal of all concrete and demolition debris. All work was performed using NDC owned and operated equipment.

Duration: January 2018 through April 2019 – Completed in 3 phases.

Contract: $865,777

General Contractor: Myers Rados, a Joint Venture

Owner: California Department of Transportation (Caltrans)