NDC completed the removal of asbestos, lead and regulated hazardous materials and the demolition of structures on a 280-acre area of the former horse racing facility located in Inglewood, CA. This included 18 large concrete barn structures, veterinary hospital, jockey hotel, water treatment plant and grandstands. The grandstands were taken down using controlled blast demolition protocols. Work also included specific area site clearing, grading and on-site crushing of concrete, masonry, brick and asphalt materials.

Duration: July 2014 through September 2015

Contract: $7,481,500

General Contractor: Turner Construction Company

Owner: Hollywood Park Land Company, LLC